Hydraulic gantry crane

Name:Hydraulic gantry crane

Details
1. The characteristics of heavy machinery hoisting
Heavy-duty machinery has the characteristics of heavy weight, high equipment strength, and large equipment diameter. Therefore, the hoisting equipment selected for hoisting has a large model and high equipment location, which not only causes a large selection of hoisting equipment, but also has a large command difficulty and high equipment value. Therefore, the equipment protection work is particularly important when the equipment is hoisted.

2. Advantages of hydraulic gantry crane for lifting heavy machinery
Hydraulic heavy lifting gantry crane has been developed as a device that can replace large cranes, with a lifting capacity of more than 1,000 tons, and is suitable for any place where heavy loads need to be lifted. Compared with traditional cranes, hydraulic gantry cranes have greatly improved safety performance and have millimeter-level precision adjustments.

3. Details of hoisting heavy machinery
Conditions that should be met before heavy equipment hoisting construction:

1. The lifting plan is approved according to the company's procedures and documents and submitted to the owner for approval.
2. Operators participating in the lifting construction should hold a certificate to work.
3. Carry out technical clarification work.
4. The equipment foundation construction is completed and the acceptance is qualified.
5. Remove the obstacles that affect the equipment hoisting, the site is level, the crane or hydraulic gantry crane is qualified within the foundation and walking area under the feet of the specified station, and the hoisting construction road is unblocked.
6. The hoisting equipment is placed accurately according to the hoisting layout plan.
7. A cordon should be set up within the scope of the hoisting site. Operators should wear a work card and uniformly dress. Irrelevant personnel are strictly prohibited from entering.
8. Before hoisting, the Quality and Safety Department organizes a major safety inspection to check the implementation of various safety measures and whether they meet the requirements of the relevant safety documents and the hoisting plan. The results of the inspection are recorded.